Glassed the ends of the boom, fitted sheave boxes. Fitting boxes:
With some fairing:
Glassed sheave box areas:
Had to make dowels for lazy jack rails
Lazy jack rails getting glassed up with biaxial tape
And installed, with fairing in progress:
This is a jig to try and drill horizontal holes for sheave pins:
Fairing:
Another drilling jig:
Sealing boom fairing with coats of epoxy:
And sheave boxes ready to paint and install:



















No comments:
Post a Comment